Phase I of a second terminal at Bandar Abbas is scheduled to open by early 2008, and will increase the port’s capacity to 3m teu. Phase II of the development will be operational in 2010, increasing total capacity to 6m teu.
You need a free subscription to read the entire article.
Login if you have already subscribed.
Subscribe
Subscribe for FREE and gain access to all our content.
More than 5000+ articles.