Monday , 20 May 2019
Latest News
The Mexican terminal of Altamira Terminal Portuaria, SA DE CV (ATP), has taken delivery of two new “tailor made” ZPMC super post-Panamax gantry cranes, increasing the productivity on the 6,000 teu ships currently calling and preparing the terminal to receive larger ships in the expected redeployment of vessels around the world.

New cranes for Altamira Terminal Portuaria

The arrival of the cranes, which have a lifting capacity of 78 tonnes and maximum lift height of 42 m under the hook, with a maximum outreach of 50 m, brings to five the number available for container handling along its 600 m berth.

Despite the current global economic slowdown, ATP and its shareholders are confident that with the new cranes the terminal will be well placed to take full advantage of the eventual recovery in trade.