The delivery will take place in Q1, 2013 and when completed will increase TCV’s RTG fleet to 23 units.
The 16-wheel RTGs will be equipped with Konecranes’ Active Load Control technology, diesel fuel saver technology, autosteering and Crane Management System. They will have a lifting capacity of 50 tons, and can stack one over five high and a six plus wide truck lane.
You need a free subscription to read the entire article.
Subscribe
Subscribe for FREE and gain access to all our content.
More than 5000+ articles.