In November of last year the terminal successfully launched the Navis N4 Terminal Operating System together with its process re-engineering initiative called New Horizon.
“This has been a pivotal year for Da Chan Bay Terminal One”, said Chief Executive Officer Mr. Ben Lai, “Hitting this million teu milestone for 2013 and successfully implementing Navis N4 means we’re well positioned to capture future growth in the Pearl River Delta.”
DCB covers an area of 112 ha with five berths along its quay of 1,830 m long and 600 m wide. Water depth alongside is currently 15.5 m and will eventually be dredged to 18 m.
You need a free subscription to read the entire article.
Subscribe
Subscribe for FREE and gain access to all our content.
More than 5000+ articles.