The construction of the second container terminal at the Port of Mombasa looks set to be completed early.
On March 19, a spokesperson for the Kenya Ports Authority (KPA) told The Star that the first phase of the Sh27bn (US$280m) terminal is expected to be complete a month or two earlier than March 2016, the previous scheduled opening date.
The terminal will increase the capacity of the port from 1.1m teu to 1.55m teu, rising to 2.3m teu by 2019.
You need a free subscription to read the entire article.
Subscribe
Subscribe for FREE and gain access to all our content.
More than 5000+ articles.