Singapore’s Prime Minister Lee Hsien Loong officially opened the newest addition to PSA Singapore Terminals’ (PSA) container port yesterday (23 June).
The S$3.5bn (US$2.6bn) Phases 3 and 4 Pasir Panjang Terminal (PPT) development with 15 berths on almost 6,000 m of quay length and up to 18 m draft, is specifically designed to serve the next generation of mega container ships with capacities larger than 10,000 teu that PSA’s customers are deploying.
When the expansion is fully operational by the end of 2017, Singapore will be able to handle a total of 50m teu annually.
You need a free subscription to read the entire article.
Subscribe
Subscribe for FREE and gain access to all our content.
More than 5000+ articles.