Liebherr has delivered two new LHM 600 mobile harbour cranes (MHCs) to the Port Elizabeth Container Terminal (PECT) in preparation for the citrus season.
The two cranes were transported took 20 days to travel from Rostock, Germany to South Africa upon the vessel Happy Dragon.
Michelle Phillips, Transnet Port Termina’s acting Chief Executive, said: “Having lost an entire crane due to gale force winds really set us back.
You need a free subscription to read the entire article.
Subscribe
Subscribe for FREE and gain access to all our content.
More than 5000+ articles.