Peru’s ministry of transport and communications (MTC) has given environmental authorisation to APM Terminals (APMT) Callao to start the next stage of development works at the North Multipurpose terminal.
Stage 3 of the project, which was approved by the MTC’s General Directorate of Environmental Affairs (DGAAM), includes the construction of a battery of vertical silos of free-flowing clean grains with a capacity of 60,000 tonnes.
There will also be two continuous grain unloaders, 2.13 ha of paving and significant improvements to the access gate for general cargo.
You need a free subscription to read the entire article.
Subscribe
Subscribe for FREE and gain access to all our content.
More than 5000+ articles.