The Georgia Ports Authority (GPA) has approved contracts totalling US$65.6m for container yard work at the Port of Savannah’s Ocean Terminal.
GPA’s board has approved three project components at the 200-acre facility, which is situated just downriver from GPA’s main container port.
These components include earth compacting to prepare the site to hold container stacks, the removal of a former bridge pier and preliminary utility installation behind the wharf structure.
You need a free subscription to read the entire article.
Subscribe
Subscribe for FREE and gain access to all our content.
More than 5000+ articles.