APM Terminals (APMT) Moín has begun construction of a new return lane outside the main facilities but within the concession area of the Moín Container Terminal (TCM) in response to an operational need identified by carriers and logistics stakeholders.
Representing an investment of more than US$1m, the work aims ot order and streamline the entry and exit of trucks, reducing the risk of dangerous manoeuvres near Route 32 and strengthening road safety in the area.
The infrastructure includes 260 linear m from the pre-entry to its connection with Route 257.
You need a free subscription to read the entire article.
Login if you have already subscribed.
Subscribe
Subscribe for FREE and gain access to all our content.
More than 5000+ articles.
